During September 2018, the Auchentibber War Memorial was demolished to make way for a complete, sympathetic rebuild. The memorial had seen better days and joints had opened up caused by rainwater intrusion and the volume of nearby traffic.
By the 20th September, the monument was completely gone and immediately after a new firm base was constructed.
2018 Sept 19 Auchentibber Memorial
2018 Sept 19 Auchentibber Memorial
The build continued throughout September and October. These photos by Alex Rochead, serve to record the necessary work, which was entirely funded by a grant.
2018 Sept 21 Auchentibber Memorial
2018 Sept 21 Auchentibber Memorial
